SATILIK HİDROELEKTRİK SANTRAL LİSANSI- FORSALE HYDRO POWER PLANT GENERATION LICENSE

When an investor sale this energy generation license for building a hydro power plant , this license is contained all the things about power plant , projects, permissions. All the projects are approved by Turkish government and all the permissions are taken from institutions of government. Turkish government guarantees that This hydro power plant can sale electrical energy with the prize of 41 cent /per kWh , for ten years. At the same time nowadays , The dolar current rate against turkish liras  is increasing day by day.

 

Plant Type:  Renewable , hydro , channel type.

Power Plant Unit Count :  8 units. (2×1.8335)+(2×3,3665)+(2×1,148)+(2×0,334) = 13.364 MWe.

Total Installed power of this plant : 13.364 MWe.

Predictable Yearly Electrical Energy Production : 45.480.000 kWh.

Power Plant Construction Dead Line :  24.03.2017.

Total Investment Cost :  16.613.252,39 $  ( CAPEX ).

Predictable Yearly Operational Cost : 400.000 $ ( OPEX).

Electrical Energy Sale Price :  17 cent / per kWh.

 Project Location of the project :  The city , “ORDU”  of Turkey.

 

Yücel ŞENOL

Electrical Engineer 

Mobile Phone : +90 530 037 88 35

Yazar Hakkında

Benzer yazılar

Yanıt verin.

E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir

Arabic AR Chinese (Simplified) ZH-CN Dutch NL English EN French FR German DE Hindi HI Italian IT Russian RU Spanish ES Turkish TR